Home
Site Map

ASF Cave Survey and Map Standards

Table 1.4: Changes of level or slope

Ken Grimes, 1 March, 1997 ASF Survey Commission

Zip Version Wordprocessor version of symbols - 166 kb

Tables
1.1 Survey Stations
1.2 Special Lines
1.3 Outlines
1.4 Changes of level or slope
1.5. Materials
1.6 Secondary deposits


1.7 Physics

1.8 Artificial Constructions
1.9 Surface Features
1.10 Entrances (1) UIS
1.11 Entrances (2) UIS

 

Map Symbols

Note: If you have problems viewing the images in the tables click here for more information and suggestions.

1.4 CHANGES OF LEVEL OR SLOPE
Ref. Map symbol Profile view
(where appropriate)
Description
4.1 Fig 4.1a Fig 4.1b Vertical change of floor level (cliff or pit), with height. Symbol (tics) on lower side
4.2 Discontinued (gradual change in slope of floor)
4.3
NEW
Fig 4.3a Fig 4.3b Horizontal entrance or pit (doline) at surface. Side sloping to passage. (differs from UIS)
4.4
NEW
Fig 4.4a Fig 4.4b Vertical entrance or pit (doline) at surface. Vertical or near-vertical walls. (differs from UIS)
4.5 Fig 4.5a Fig 4.5b Vertical change in roof level, (step or blind shaft), with height. Dots on lower side. (differs from UIS)
4.6 Discontinued (Gradual change in slope of roof)
4.7 Fig 4.7a Fig 4.7b Connecting shaft between levels.
4.8 Fig 4.8 Direction of downward slope of floor with (optional) gradient in degrees.
4.9 Fig 4.9 Direction of downward slope of roof with (optional) gradient in degrees.
4.10
NEW
Fig 4.10 Height from floor to roof, NEW UIS symbol
4.11
NEW
Fig 4.11 Depth of water; Air space above water; and combined water depth and air space. NEW (not catered for in UIS, this is based on USA usage)
Copyright © 1962, 1978, 1985, 1999 Australian Speleological Federation Inc. May be reproduced for non-commercial use provided this copyright notice is retained in full.

Top